In 2017, the step by step methodology for participatory planning was tested at two pilot sites: the upland area of Sault du Baril waterfalls, and the wetlands and mangroves of the lowland coastal area of Gwelan (O’Rouck). The methodology was subsequently revised, taking into account lessons learned from these two pilot sites within the Rivière Froide watershed of Anse-à-Veau. Section One below presents the Step-by-Step guide, and Section Two includes the full text of participatory management plans for the two pilot sites.
> THE GLENN SMUCKER ARCHIVE
Participatory Watershed Management Planning: A Step-by-Step Guide
|
RELATED CONTENT
|
SUBSCRIBE
Subscribe and get updates on new material upload, news and upcoming events.